<section xmlns="http://xml.house.gov/schemas/uslm/1.0" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:dcterms="http://purl.org/dc/terms/" style="-uslm-lc:I80" id="idad8b803e-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493"><num value="16493">§ 16493.</num><heading> National Priority Project Designation</heading><subsection style="-uslm-lc:I19" class="indent2 firstIndent-2" id="idad8b803f-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/a"><num value="a" class="bold">(a)</num><heading class="bold"> Designation of National Priority Projects</heading><paragraph style="-uslm-lc:I79" class="indent3 firstIndent-2" id="idad8b8040-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/a/1"><num value="1" class="bold">(1)</num><heading class="bold"> In general</heading><content><p style="-uslm-lc:I12" class="indent1">There is established the National Priority Project Designation (referred to in this section as the “Designation”), which shall be evidenced by a medal bearing the inscription “National Priority Project”.</p>
</content>
</paragraph>
<paragraph style="-uslm-lc:I79" class="indent3 firstIndent-2" id="idad8b8041-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/a/2"><num value="2" class="bold">(2)</num><heading class="bold"> Design and materials</heading><content><p style="-uslm-lc:I12" class="indent1">The medal shall be of such design and materials and bear such additional inscriptions as the President may prescribe.</p>
</content>
</paragraph>
</subsection>
<subsection style="-uslm-lc:I19" class="indent2 firstIndent-2" id="idad8b8042-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/b"><num value="b" class="bold">(b)</num><heading class="bold"> Making and presentation of Designation</heading><paragraph style="-uslm-lc:I79" class="indent3 firstIndent-2" id="idad8b8043-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/b/1"><num value="1" class="bold">(1)</num><heading class="bold"> In general</heading><chapeau style="-uslm-lc:I12" class="indent1">The President, on the basis of recommendations made by the Secretary, shall annually designate organizations that have—</chapeau><subparagraph style="-uslm-lc:I13" class="indent2" id="idad8b8044-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/b/1/A"><num value="A">(A)</num><content> advanced the field of renewable energy technology and contributed to North American energy independence; and</content>
</subparagraph>
<subparagraph style="-uslm-lc:I13" class="indent2" id="idad8b8045-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/b/1/B"><num value="B">(B)</num><content> been certified by the Secretary under subsection (e).</content>
</subparagraph>
</paragraph>
<paragraph style="-uslm-lc:I79" class="indent3 firstIndent-2" id="idad8b8046-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/b/2"><num value="2" class="bold">(2)</num><heading class="bold"> Presentation</heading><content><p style="-uslm-lc:I12" class="indent1">The President shall designate projects with such ceremonies as the President may prescribe.</p>
</content>
</paragraph>
<paragraph style="-uslm-lc:I79" class="indent3 firstIndent-2" id="idad8b8047-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/b/3"><num value="3" class="bold">(3)</num><heading class="bold"> Use of Designation</heading><content><p style="-uslm-lc:I12" class="indent1">An organization that receives a Designation under this section may publicize the Designation of the organization as a National Priority Project in advertising.</p>
</content>
</paragraph>
<paragraph style="-uslm-lc:I79" class="indent3 firstIndent-2" id="idad8ba758-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/b/4"><num value="4" class="bold">(4)</num><heading class="bold"> Categories in which the Designation may be given</heading><chapeau style="-uslm-lc:I12" class="indent1">Separate Designations shall be made to qualifying projects in each of the following categories:</chapeau><subparagraph style="-uslm-lc:I13" class="indent2" id="idad8ba759-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/b/4/A"><num value="A">(A)</num><content> Wind and biomass energy generation projects.</content>
</subparagraph>
<subparagraph style="-uslm-lc:I13" class="indent2" id="idad8ba75a-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/b/4/B"><num value="B">(B)</num><content> Photovoltaic and fuel cell energy generation projects.</content>
</subparagraph>
<subparagraph style="-uslm-lc:I13" class="indent2" id="idad8ba75b-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/b/4/C"><num value="C">(C)</num><content> Energy efficient building and renewable energy projects.</content>
</subparagraph>
<subparagraph style="-uslm-lc:I13" class="indent2" id="idad8ba75c-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/b/4/D"><num value="D">(D)</num><content> First-in-Class projects.</content>
</subparagraph>
</paragraph>
</subsection>
<subsection style="-uslm-lc:I19" class="indent2 firstIndent-2" id="idad8ba75d-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/c"><num value="c" class="bold">(c)</num><heading class="bold"> Selection criteria</heading><paragraph style="-uslm-lc:I79" class="indent3 firstIndent-2" id="idad8ba75e-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/c/1"><num value="1" class="bold">(1)</num><heading class="bold"> In general</heading><content><p style="-uslm-lc:I12" class="indent1">Certification and selection of the projects to receive the Designation shall be based on criteria established under this subsection.</p>
</content>
</paragraph>
<paragraph style="-uslm-lc:I79" class="indent3 firstIndent-2" id="idad8ba75f-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/c/2"><num value="2" class="bold">(2)</num><heading class="bold"> Wind, biomass, and building projects</heading><content><p style="-uslm-lc:I12" class="indent1">In the case of a wind, biomass, or building project, the project shall demonstrate that the project will install not less than 30 megawatts of renewable energy generation capacity.</p>
</content>
</paragraph>
<paragraph style="-uslm-lc:I79" class="indent3 firstIndent-2" id="idad8ba760-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/c/3"><num value="3" class="bold">(3)</num><heading class="bold"> Solar photovoltaic and fuel cell projects</heading><content><p style="-uslm-lc:I12" class="indent1">In the case of a solar photovoltaic or fuel cell project, the project shall demonstrate that the project will install not less than 3 megawatts of renewable energy generation capacity.</p>
</content>
</paragraph>
<paragraph style="-uslm-lc:I79" class="indent3 firstIndent-2" id="idad8ba761-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/c/4"><num value="4" class="bold">(4)</num><heading class="bold"> Energy efficient building and renewable energy projects</heading><chapeau style="-uslm-lc:I12" class="indent1">In the case of an energy efficient building or renewable energy project, in addition to meeting the criteria established under paragraph (2), each building project shall demonstrate that the project will—</chapeau><subparagraph style="-uslm-lc:I13" class="indent2" id="idad8ba762-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/c/4/A"><num value="A">(A)</num><content> comply with third-party certification standards for high-performance, sustainable buildings;</content>
</subparagraph>
<subparagraph style="-uslm-lc:I13" class="indent2" id="idad8ba763-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/c/4/B"><num value="B">(B)</num><content> use whole-building integration of energy efficiency and environmental performance design and technology, including advanced building controls;</content>
</subparagraph>
<subparagraph style="-uslm-lc:I13" class="indent2" id="idad8ba764-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/c/4/C"><num value="C">(C)</num><content> use renewable energy for at least 50 percent of the energy consumption of the project;</content>
</subparagraph>
<subparagraph style="-uslm-lc:I13" class="indent2" id="idad8ba765-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/c/4/D"><num value="D">(D)</num><content> comply with applicable Energy Star standards; and</content>
</subparagraph>
<subparagraph style="-uslm-lc:I13" class="indent2" id="idad8ba766-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/c/4/E"><num value="E">(E)</num><content> include at least 5,000,000 square feet of enclosed space.</content>
</subparagraph>
</paragraph>
<paragraph style="-uslm-lc:I79" class="indent3 firstIndent-2" id="idad8ba767-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/c/5"><num value="5" class="bold">(5)</num><heading class="bold"> First-in-Class use</heading><chapeau style="-uslm-lc:I12" class="indent1">Notwithstanding paragraphs (2) through (4), a new building project may qualify under this section if the Secretary determines that the project—</chapeau><subparagraph style="-uslm-lc:I13" class="indent2" id="idad8ba768-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/c/5/A"><num value="A">(A)</num><content> represents a First-In-Class use of renewable energy; or</content>
</subparagraph>
<subparagraph style="-uslm-lc:I13" class="indent2" id="idad8ba769-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/c/5/B"><num value="B">(B)</num><content> otherwise establishes a new paradigm of building integrated renewable energy use or energy efficiency.</content>
</subparagraph>
</paragraph>
</subsection>
<subsection style="-uslm-lc:I19" class="indent2 firstIndent-2" id="idad8ba76a-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/d"><num value="d" class="bold">(d)</num><heading class="bold"> Application</heading><paragraph style="-uslm-lc:I79" class="indent3 firstIndent-2" id="idad8ba76b-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/d/1"><num value="1" class="bold">(1)</num><heading class="bold"> Initial applications</heading><content><p style="-uslm-lc:I12" class="indent1">No later than 120 days after <date date="2005-08-08">August 8, 2005</date>, and annually thereafter, the Secretary shall publish in the Federal Register an invitation and guidelines for submitting applications, consistent with this section.</p>
</content>
</paragraph>
<paragraph style="-uslm-lc:I79" class="indent3 firstIndent-2" id="idad8ba76c-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/d/2"><num value="2" class="bold">(2)</num><heading class="bold"> Contents</heading><content><p style="-uslm-lc:I12" class="indent1">The application shall describe the project, or planned project, and the plans to meet the criteria established under subsection (c).</p>
</content>
</paragraph>
</subsection>
<subsection style="-uslm-lc:I19" class="indent2 firstIndent-2" id="idad8ba76d-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/e"><num value="e" class="bold">(e)</num><heading class="bold"> Certification</heading><paragraph style="-uslm-lc:I79" class="indent3 firstIndent-2" id="idad8ba76e-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/e/1"><num value="1" class="bold">(1)</num><heading class="bold"> In general</heading><content><p style="-uslm-lc:I12" class="indent1">Not later than 60 days after the application period described in subsection (d), and annually thereafter, the Secretary shall certify projects that are reasonably expected to meet the criteria established under subsection (c).</p>
</content>
</paragraph>
<paragraph style="-uslm-lc:I79" class="indent3 firstIndent-2" id="idad8ba76f-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/e/2"><num value="2" class="bold">(2)</num><heading class="bold"> Certified projects</heading><chapeau style="-uslm-lc:I12" class="indent1">The Secretary shall designate personnel of the Department to work with persons carrying out each certified project and ensure that the personnel—</chapeau><subparagraph style="-uslm-lc:I13" class="indent2" id="idad8ba770-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/e/2/A"><num value="A">(A)</num><content> provide each certified project with guidance in meeting the criteria established under subsection (c);</content>
</subparagraph>
<subparagraph style="-uslm-lc:I13" class="indent2" id="idad8ba771-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/e/2/B"><num value="B">(B)</num><content> identify programs of the Department, including National Laboratories and Technology Centers, that will assist each project in meeting the criteria established under subsection (c); and</content>
</subparagraph>
<subparagraph style="-uslm-lc:I13" class="indent2" id="idad8ba772-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/e/2/C"><num value="C">(C)</num><content> ensure that knowledge and transfer of the most current technology between the applicable resources of the Federal Government (including the National Laboratories and Technology Centers, the Department, and the Environmental Protection Agency) and the certified projects is being facilitated to accelerate commercialization of work developed through those resources.</content>
</subparagraph>
</paragraph>
</subsection>
<subsection style="-uslm-lc:I19" class="indent2 firstIndent-2" id="idad8ba773-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s16493/f"><num value="f" class="bold">(f)</num><heading class="bold"> Authorization of appropriations</heading><content><p style="-uslm-lc:I11" class="indent0">There are authorized to be appropriated such sums as are necessary to carry out this section for each of fiscal years 2006 through 2010.</p>
</content>
</subsection>
<sourceCredit id="idad8ba774-09a0-11eb-a85b-f5cef3d06f4d">(<ref href="/us/pl/109/58/tXIV/s1405">Pub. L. 109–58, title XIV, § 1405</ref>, <date date="2005-08-08">Aug. 8, 2005</date>, <ref href="/us/stat/119/1062">119 Stat. 1062</ref>.)</sourceCredit>
</section>