<section xmlns="http://xml.house.gov/schemas/uslm/1.0" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:dcterms="http://purl.org/dc/terms/" style="-uslm-lc:I80" id="idd9429676-406b-11eb-bd25-fd7436c081d8" identifier="/us/usc/t42/s17385"><num value="17385">§ 17385.</num><heading> Smart grid interoperability framework</heading><subsection style="-uslm-lc:I19" class="indent2 firstIndent-2" id="idd9429677-406b-11eb-bd25-fd7436c081d8" identifier="/us/usc/t42/s17385/a"><num value="a" class="bold">(a)</num><heading class="bold"> Interoperability framework</heading><chapeau style="-uslm-lc:I11" class="indent0">The Director of the National Institute of Standards and Technology shall have primary responsibility to coordinate the development of a framework that includes protocols and model standards for information management to achieve interoperability of smart grid devices and systems. Such protocols and standards shall further align policy, business, and technology approaches in a manner that would enable all electric resources, including demand-side resources, to contribute to an efficient, reliable electricity network. In developing such protocols and standards—</chapeau><paragraph style="-uslm-lc:I12" class="indent1" id="idd9429678-406b-11eb-bd25-fd7436c081d8" identifier="/us/usc/t42/s17385/a/1"><num value="1">(1)</num><content> the Director shall seek input and cooperation from the Commission, OEDER and its Smart Grid Task Force, the Smart Grid Advisory Committee, other relevant Federal and State agencies; and</content>
</paragraph>
<paragraph style="-uslm-lc:I12" class="indent1" id="idd9429679-406b-11eb-bd25-fd7436c081d8" identifier="/us/usc/t42/s17385/a/2"><num value="2">(2)</num><content> the Director shall also solicit input and cooperation from private entities interested in such protocols and standards, including but not limited to the Gridwise Architecture Council, the International Electrical and Electronics Engineers, the National Electric Reliability Organization recognized by the Federal Energy Regulatory Commission, and National Electrical Manufacturer’s Association.</content>
</paragraph>
</subsection>
<subsection style="-uslm-lc:I19" class="indent2 firstIndent-2" id="idd942967a-406b-11eb-bd25-fd7436c081d8" identifier="/us/usc/t42/s17385/b"><num value="b" class="bold">(b)</num><heading class="bold"> Scope of framework</heading><chapeau style="-uslm-lc:I11" class="indent0">The framework developed under subsection (a) shall be flexible, uniform and technology neutral, including but not limited to technologies for managing smart grid information, and designed—</chapeau><paragraph style="-uslm-lc:I12" class="indent1" id="idd942967b-406b-11eb-bd25-fd7436c081d8" identifier="/us/usc/t42/s17385/b/1"><num value="1">(1)</num><content> to accommodate traditional, centralized generation and transmission resources and consumer distributed resources, including distributed generation, renewable generation, energy storage, energy efficiency, and demand response and enabling devices and systems;</content>
</paragraph>
<paragraph style="-uslm-lc:I12" class="indent1" id="idd942967c-406b-11eb-bd25-fd7436c081d8" identifier="/us/usc/t42/s17385/b/2"><num value="2">(2)</num><chapeau> to be flexible to incorporate—</chapeau><subparagraph style="-uslm-lc:I13" class="indent2" id="idd942967d-406b-11eb-bd25-fd7436c081d8" identifier="/us/usc/t42/s17385/b/2/A"><num value="A">(A)</num><content> regional and organizational differences; and</content>
</subparagraph>
<subparagraph style="-uslm-lc:I13" class="indent2" id="idd942967e-406b-11eb-bd25-fd7436c081d8" identifier="/us/usc/t42/s17385/b/2/B"><num value="B">(B)</num><content> technological innovations;</content>
</subparagraph>
</paragraph>
<paragraph style="-uslm-lc:I12" class="indent1" id="idd942967f-406b-11eb-bd25-fd7436c081d8" identifier="/us/usc/t42/s17385/b/3"><num value="3">(3)</num><chapeau> to consider the use of voluntary uniform standards for certain classes of mass-produced electric appliances and equipment for homes and businesses that enable customers, at their election and consistent with applicable State and Federal laws, and are manufactured with the ability to respond to electric grid emergencies and demand response signals by curtailing all, or a portion of, the electrical power consumed by the appliances or equipment in response to an emergency or demand response signal, including through—</chapeau><subparagraph style="-uslm-lc:I13" class="indent2" id="idd9429680-406b-11eb-bd25-fd7436c081d8" identifier="/us/usc/t42/s17385/b/3/A"><num value="A">(A)</num><content> load reduction to reduce total electrical demand;</content>
</subparagraph>
<subparagraph style="-uslm-lc:I13" class="indent2" id="idd9429681-406b-11eb-bd25-fd7436c081d8" identifier="/us/usc/t42/s17385/b/3/B"><num value="B">(B)</num><content> adjustment of load to provide grid ancillary services; and</content>
</subparagraph>
<subparagraph style="-uslm-lc:I13" class="indent2" id="idd9429682-406b-11eb-bd25-fd7436c081d8" identifier="/us/usc/t42/s17385/b/3/C"><num value="C">(C)</num><content> in the event of a reliability crisis that threatens an outage, short-term load shedding to help preserve the stability of the grid; and</content>
</subparagraph>
</paragraph>
<paragraph style="-uslm-lc:I12" class="indent1" id="idd9429683-406b-11eb-bd25-fd7436c081d8" identifier="/us/usc/t42/s17385/b/4"><num value="4">(4)</num><content> such voluntary standards should incorporate appropriate manufacturer lead time.<ref class="footnoteRef" idref="fn004182">1</ref><note type="footnote" id="fn004182"><num>1</num> So in original. Does not fit with subsec. (b) introductory provisions.</note></content>
</paragraph>
</subsection>
<subsection style="-uslm-lc:I19" class="indent2 firstIndent-2" id="idd9429684-406b-11eb-bd25-fd7436c081d8" identifier="/us/usc/t42/s17385/c"><num value="c" class="bold">(c)</num><heading class="bold"> Timing of framework development</heading><content><p style="-uslm-lc:I11" class="indent0">The Institute shall begin work pursuant to this section within 60 days of <date date="2007-12-19">December 19, 2007</date>. The Institute shall provide and publish an initial report on progress toward recommended or consensus standards and protocols within 1 year after <date date="2007-12-19">December 19, 2007</date>, further reports at such times as developments warrant in the judgment of the Institute, and a final report when the Institute determines that the work is completed or that a Federal role is no longer necessary.</p>
</content>
</subsection>
<subsection style="-uslm-lc:I19" class="indent2 firstIndent-2" id="idd9429685-406b-11eb-bd25-fd7436c081d8" identifier="/us/usc/t42/s17385/d"><num value="d" class="bold">(d)</num><heading class="bold"> Standards for interoperability in Federal jurisdiction</heading><content><p style="-uslm-lc:I11" class="indent0">At any time after the Institute’s work has led to sufficient consensus in the Commission’s judgment, the Commission shall institute a rulemaking proceeding to adopt such standards and protocols as may be necessary to insure smart-grid functionality and interoperability in interstate transmission of electric power, and regional and wholesale electricity markets.</p>
</content>
</subsection>
<subsection style="-uslm-lc:I19" class="indent2 firstIndent-2" id="idd9429686-406b-11eb-bd25-fd7436c081d8" identifier="/us/usc/t42/s17385/e"><num value="e" class="bold">(e)</num><heading class="bold"> Authorization</heading><content><p style="-uslm-lc:I11" class="indent0">There are authorized to be appropriated for the purposes of this section $5,000,000 to the Institute to support the activities required by this subsection <ref class="footnoteRef" idref="fn004183">2</ref><note type="footnote" id="fn004183"><num>2</num> So in original. Probably should be “section”.</note> for each of fiscal years 2008 through 2012.</p>
</content>
</subsection>
<sourceCredit id="idd9429687-406b-11eb-bd25-fd7436c081d8">(<ref href="/us/pl/110/140/tXIII/s1305">Pub. L. 110–140, title XIII, § 1305</ref>, <date date="2007-12-19">Dec. 19, 2007</date>, <ref href="/us/stat/121/1787">121 Stat. 1787</ref>.)</sourceCredit>
<notes type="uscNote" id="idd9429688-406b-11eb-bd25-fd7436c081d8">
<note style="-uslm-lc:I76" topic="codification" id="idd9429689-406b-11eb-bd25-fd7436c081d8"><heading class="centered smallCaps">Codification</heading>
<p style="-uslm-lc:I21" class="indent0"><date date="2007-12-19">December 19, 2007</date>, referred to in subsec. (c), was in the original “enactment” and was translated as meaning the date of enactment of <ref href="/us/pl/110/140">Pub. L. 110–140</ref>, to reflect the probable intent of Congress.</p>
</note>
<note style="-uslm-lc:I74" topic="effectiveDate" id="idd942968a-406b-11eb-bd25-fd7436c081d8"><heading class="centered smallCaps">Effective Date</heading><p style="-uslm-lc:I21" class="indent0">Section effective on the date that is 1 day after <date date="2007-12-19">Dec. 19, 2007</date>, see <ref href="/us/pl/110/140/s1601">section 1601 of Pub. L. 110–140</ref>, set out as a note under <ref href="/us/usc/t2/s1824">section 1824 of Title 2</ref>, The Congress.</p>
</note>
</notes>
</section>