<section xmlns="http://xml.house.gov/schemas/uslm/1.0" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:dcterms="http://purl.org/dc/terms/" style="-uslm-lc:I80" id="idadb21ac4-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s18324"><num value="18324">§ 18324.</num><heading> Utilization of existing workforce and assets in development of Space Launch System and multi-purpose crew vehicle</heading><subsection style="-uslm-lc:I19" class="indent2 firstIndent-2" id="idadb21ac5-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s18324/a"><num value="a" class="bold">(a)</num><heading class="bold"> In general</heading><chapeau style="-uslm-lc:I11" class="indent0">In developing the Space Launch System pursuant to <ref href="/us/usc/t42/s18322">section 18322 of this title</ref> and the multi-purpose crew vehicle pursuant to <ref href="/us/usc/t42/s18323">section 18323 of this title</ref>, the Administrator shall, to the extent practicable utilize—</chapeau><paragraph style="-uslm-lc:I12" class="indent1" id="idadb21ac6-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s18324/a/1"><num value="1">(1)</num><chapeau> existing contracts, investments, workforce, industrial base, and capabilities from the Space Shuttle and Orion and Ares 1 projects, including—</chapeau><subparagraph style="-uslm-lc:I13" class="indent2" id="idadb21ac7-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s18324/a/1/A"><num value="A">(A)</num><content> space-suit development activities for application to, and coordinated development of, a multi-purpose crew vehicle suit and associated life-support requirements with potential development of standard NASA-certified suit and life support systems for use in alternative commercially-developed crew transportation systems; and</content>
</subparagraph>
<subparagraph style="-uslm-lc:I13" class="indent2" id="idadb21ac8-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s18324/a/1/B"><num value="B">(B)</num><content> Space Shuttle-derived components and Ares 1 components that use existing United States propulsion systems, including liquid fuel engines, external tank or tank-related capability, and solid rocket motor engines; and</content>
</subparagraph>
</paragraph>
<paragraph style="-uslm-lc:I12" class="indent1" id="idadb21ac9-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s18324/a/2"><num value="2">(2)</num><content> associated testing facilities, either in being or under construction as of <date date="2010-10-11">October 11, 2010</date>.</content>
</paragraph>
</subsection>
<subsection style="-uslm-lc:I19" class="indent2 firstIndent-2" id="idadb21aca-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s18324/b"><num value="b" class="bold">(b)</num><heading class="bold"> Discharge of requirements</heading><chapeau style="-uslm-lc:I11" class="indent0">In meeting the requirements of subsection (a), the Administrator—</chapeau><paragraph style="-uslm-lc:I12" class="indent1" id="idadb21acb-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s18324/b/1"><num value="1">(1)</num><content> shall, to the extent practicable, utilize ground-based manufacturing capability, ground testing activities, launch and operations infrastructure, and workforce expertise;</content>
</paragraph>
<paragraph style="-uslm-lc:I12" class="indent1" id="idadb21acc-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s18324/b/2"><num value="2">(2)</num><content> shall, to the extent practicable, minimize the modification and development of ground infrastructure and maximize the utilization of existing software, vehicle, and mission operations processes;</content>
</paragraph>
<paragraph style="-uslm-lc:I12" class="indent1" id="idadb21acd-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s18324/b/3"><num value="3">(3)</num><content> shall complete construction and activation of the A–3 test stand with a completion goal of <date date="2013-09-30">September 30, 2013</date>;</content>
</paragraph>
<paragraph style="-uslm-lc:I12" class="indent1" id="idadb21ace-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s18324/b/4"><num value="4">(4)</num><content> may procure, develop, and flight test applicable components; and</content>
</paragraph>
<paragraph style="-uslm-lc:I12" class="indent1" id="idadb21acf-09a0-11eb-a85b-f5cef3d06f4d" identifier="/us/usc/t42/s18324/b/5"><num value="5">(5)</num><content> shall take appropriate actions to ensure timely and cost-effective development of the Space Launch System and the multi-purpose crew vehicle, including the use of a procurement approach that incorporates adequate and effective oversight, the facilitation of contractor efficiencies, and the stream-lining of contract and procurement requirements.</content>
</paragraph>
</subsection>
<sourceCredit id="idadb21ad0-09a0-11eb-a85b-f5cef3d06f4d">(<ref href="/us/pl/111/267/tIII/s304">Pub. L. 111–267, title III, § 304</ref>, <date date="2010-10-11">Oct. 11, 2010</date>, <ref href="/us/stat/124/2816">124 Stat. 2816</ref>.)</sourceCredit>
</section>