{"identifier":"/us/usc/t42/s8343","title_num":"42","num":"§ 8343.","heading":"Rules relating to case-by-case and category prohibitions","status":null,"guid":"id79138bf5-4aa7-11eb-94f5-9ff2c44f6f3c","source_credit":"(Pub. L. 95–620, title III, § 303, Nov. 9, 1978, 92 Stat. 3306; Pub. L. 100–42, § 1(c)(9), May 21, 1987, 101 Stat. 312.)","seq_in_title":5648,"parent_identifier":"/us/usc/t42/ch92/schIII/ptA","ancestors":[{"identifier":"/us/usc/t42","level":"title","num":"Title 42—","heading":"THE PUBLIC HEALTH AND WELFARE","status":null,"is_section":false},{"identifier":"/us/usc/t42/ch92","level":"chapter","num":"CHAPTER 92—","heading":"POWERPLANT AND INDUSTRIAL FUEL USE","status":null,"is_section":false},{"identifier":"/us/usc/t42/ch92/schIII","level":"subchapter","num":"SUBCHAPTER III—","heading":"EXISTING FACILITIES","status":null,"is_section":false},{"identifier":"/us/usc/t42/ch92/schIII/ptA","level":"part","num":"Part A—","heading":"Prohibitions","status":null,"is_section":false}],"xml":"<section xmlns=\"http://xml.house.gov/schemas/uslm/1.0\" xmlns:xsi=\"http://www.w3.org/2001/XMLSchema-instance\" xmlns:dc=\"http://purl.org/dc/elements/1.1/\" xmlns:dcterms=\"http://purl.org/dc/terms/\" style=\"-uslm-lc:I80\" id=\"id0aab816d-80bc-11ea-808b-a3be13bc391b\" identifier=\"/us/usc/t42/s8343\"><num value=\"8343\">§ 8343.</num><heading> Rules relating to case-by-case and category prohibitions</heading><subsection style=\"-uslm-lc:I19\" class=\"indent2 firstIndent-2\" id=\"id0aab816e-80bc-11ea-808b-a3be13bc391b\" identifier=\"/us/usc/t42/s8343/a\"><num value=\"a\" class=\"bold\">(a)</num><heading class=\"bold\"> Case-by-case prohibitions</heading><paragraph style=\"-uslm-lc:I11\" class=\"indent0\" id=\"id0aab816f-80bc-11ea-808b-a3be13bc391b\" identifier=\"/us/usc/t42/s8343/a/1\"><num value=\"1\">(1)</num><content> Except to the extent authorized by subsection (b), the Secretary shall prohibit any powerplant from using natural gas or petroleum under the authority granted him under section 8341(b) or (c) of this title only by means of a final order issued by him which shall be limited to the particular powerplant involved.</content>\n</paragraph>\n<paragraph style=\"-uslm-lc:I11\" class=\"indent0\" id=\"id0aab8170-80bc-11ea-808b-a3be13bc391b\" identifier=\"/us/usc/t42/s8343/a/2\"><num value=\"2\">(2)</num><content> The Secretary may issue such a final order only with respect to a powerplant which is not, at the time the proposed order is issued, covered by a final rule issued under section <ref class=\"footnoteRef\" idref=\"fn003758\">1</ref><note type=\"footnote\" id=\"fn003758\"><num>1</num> So in original. Probably should be “subsection”.</note> (b).</content>\n</paragraph>\n</subsection>\n<subsection style=\"-uslm-lc:I19\" class=\"indent2 firstIndent-2\" id=\"id0aab8171-80bc-11ea-808b-a3be13bc391b\" identifier=\"/us/usc/t42/s8343/b\"><num value=\"b\" class=\"bold\">(b)</num><heading class=\"bold\"> Prohibitions applicable to categories of facilities</heading><paragraph style=\"-uslm-lc:I11\" class=\"indent0\" id=\"id0aab8172-80bc-11ea-808b-a3be13bc391b\" identifier=\"/us/usc/t42/s8343/b/1\"><num value=\"1\">(1)</num><content> The Secretary may prohibit, by rule, the use of natural gas or petroleum under <ref href=\"/us/usc/t42/s8341/b\">section 8341(b) of this title</ref> in existing electric powerplants.</content>\n</paragraph>\n<paragraph style=\"-uslm-lc:I11\" class=\"indent0\" id=\"id0aab8173-80bc-11ea-808b-a3be13bc391b\" identifier=\"/us/usc/t42/s8343/b/2\"><num value=\"2\">(2)</num><content> Each powerplant to be covered by any final rule issued under this subsection shall be specifically identified in the proposed rule published under <ref href=\"/us/usc/t42/s8411/b\">section 8411(b) of this title</ref>.</content>\n</paragraph>\n<paragraph style=\"-uslm-lc:I11\" class=\"indent0\" id=\"id0aab8174-80bc-11ea-808b-a3be13bc391b\" identifier=\"/us/usc/t42/s8343/b/3\"><num value=\"3\">(3)</num><content> In prescribing any final rule under this subsection, the Secretary shall take into account any special circumstances or characteristics of each category of powerplants (such as the intermittent use, size, age, or geographic location of such powerplants). Any such rules shall not apply in the case of any existing electric powerplant with respect to which a comparable prohibition was issued by order.</content>\n</paragraph>\n</subsection>\n<sourceCredit id=\"id0aab8175-80bc-11ea-808b-a3be13bc391b\">(<ref href=\"/us/pl/95/620/tIII/s303\">Pub. L. 95–620, title III, § 303</ref>, <date date=\"1978-11-09\">Nov. 9, 1978</date>, <ref href=\"/us/stat/92/3306\">92 Stat. 3306</ref>; <ref href=\"/us/pl/100/42/s1/c/9\">Pub. L. 100–42, § 1(c)(9)</ref>, <date date=\"1987-05-21\">May 21, 1987</date>, <ref href=\"/us/stat/101/312\">101 Stat. 312</ref>.)</sourceCredit>\n<notes type=\"uscNote\" id=\"id0aab8176-80bc-11ea-808b-a3be13bc391b\">\n<note style=\"-uslm-lc:I74\" topic=\"amendments\" id=\"id0aab8177-80bc-11ea-808b-a3be13bc391b\"><heading class=\"centered smallCaps\">Amendments</heading><p style=\"-uslm-lc:I21\" class=\"indent0\">1987—Subsec. (a)(1). <ref href=\"/us/pl/100/42/s1/c/9/A\">Pub. L. 100–42, § 1(c)(9)(A)</ref>, (B), struck out “or installation” after “powerplant” in two places and “or 8342” after “section 8341(b) or (c)”.</p>\n<p style=\"-uslm-lc:I21\" class=\"indent0\">Subsec. (a)(2). <ref href=\"/us/pl/100/42/s1/c/9/A\">Pub. L. 100–42, § 1(c)(9)(A)</ref>, struck out “or installation” after “powerplant”.</p>\n<p style=\"-uslm-lc:I21\" class=\"indent0\">Subsec. (a)(3). <ref href=\"/us/pl/100/42/s1/c/9/C\">Pub. L. 100–42, § 1(c)(9)(C)</ref>, struck out par. (3) which read as follows:</p>\n<p style=\"-uslm-lc:I21\" class=\"indent0\">“(A) Subject to subparagraph (B), the Secretary shall not issue a final order under this subsection to any powerplant if it is demonstrated that such powerplant would have been granted an exemption if such prohibition had been established by a final rule pursuant to subsection (b) rather than by order pursuant to this subsection, except that if a temporary exemption would have been granted, such a final order may be issued but may not take effect until such time as the temporary exemption would have terminated.</p>\n<p style=\"-uslm-lc:I21\" class=\"indent0\">“(B) In any case in which an order is not issued by reason of subparagraph (A) or in which the effective date of such order is delayed under subparagraph (A), the Secretary shall take such steps as may be necessary to assure the installation involved complies with the same requirements (including provisions of <ref href=\"/us/usc/t42/s8354/a\">section 8354(a) of this title</ref>) as would have been applicable if an exemption had been granted based upon the grounds for which the order is not issued or the effective date of which is delayed.”</p>\n<p style=\"-uslm-lc:I21\" class=\"indent0\">Subsec. (b)(1). <ref href=\"/us/pl/100/42/s1/c/9/D\">Pub. L. 100–42, § 1(c)(9)(D)</ref>, amended par. (1) generally. Prior to amendment, par. (1) read as follows: “The Secretary may, by rule, prohibit the use of natural gas or petroleum pursuant to section 8341(b) or 8342(a) of this title—</p>\n<p style=\"-uslm-lc:I22\" class=\"indent1\">“(A) in the case of any category of existing electric powerplants identified in such rule; and</p>\n<p style=\"-uslm-lc:I22\" class=\"indent1\">“(B) in the case of any category of existing major fuel-burning installations which have design capabilities of consuming fuel (or any mixture thereof) at a fuel heat input rate of 300 million Btu’s per hour or greater which are identified in such rule.”</p>\n<p style=\"-uslm-lc:I21\" class=\"indent0\">Subsec. (b)(2). <ref href=\"/us/pl/100/42/s1/c/9/A\">Pub. L. 100–42, § 1(c)(9)(A)</ref>, struck out “or installation” after “powerplant”.</p>\n<p style=\"-uslm-lc:I21\" class=\"indent0\">Subsec. (b)(3). <ref href=\"/us/pl/100/42/s1/c/9/A\">Pub. L. 100–42, § 1(c)(9)(A)</ref>, (E), struck out “or installations” after “powerplants” in two places in introductory provisions, and amended last sentence generally. Prior to amendment, last sentence read as follows: “Any such rules shall not apply in the case of any existing electric powerplant with respect to which a comparable prohibition was issued by order.”</p>\n</note>\n</notes>\n</section>","provision":null,"duplicates":[],"release":{"label":"116-252","currency_date":"2020-12-22","congress":116,"law_num":252,"excluded_laws":[],"update_num":null,"seq":222,"is_partial":false,"caveat":null,"titles_affected":["18","20","31","34","40","42"],"ingested_titles":[]},"served_from":{"label":"116-252","currency_date":"2020-12-22","congress":116,"law_num":252,"excluded_laws":[],"update_num":null,"seq":222,"is_partial":false,"caveat":null,"titles_affected":["18","20","31","34","40","42"],"ingested_titles":[]},"content_first_seen":{"label":"116-138not113","currency_date":"2020-04-10","congress":116,"law_num":138,"excluded_laws":[113],"update_num":null,"seq":197,"is_partial":true,"caveat":"Current through Public Law 116-138 (04/10/2020), except 116-113.","titles_affected":["01","02","05","05a","06","10","11","12","15","17","18","20","21","22","23","25","26","29","31","35","37","38","39","40","41","42","45","49","50"],"ingested_titles":[]},"is_exact":true,"note":null}