Skip to main content

§ 1816a. Design-build contracts

Version history — every release point where this text changed

Release point 119-4 · current through 03/15/2025

§ 1816a.

Design-build contracts

(a)

Notwithstanding any other provision of law, the Architect of the Capitol may use the two-phase selection procedures authorized in section 3309 of title 41 for entering into a contract for the design and construction of a public building, facility, or work in the same manner and under the same terms and conditions as the head of an executive agency under such section.

(b)

This section shall apply with respect to fiscal year 2008 and each succeeding fiscal year.

Source(Pub. L. 110–161, div. H, title I, § 1308,
Dec. 26, 2007
, 121 Stat. 2244.)
Notes

Editorial Notes

Codification

In subsec. (a), “section 3309 of title 41” substituted for “section 303M of the Federal Property and Administrative Services Act of 1949 (41 U.S.C. 253m)” on authority of Pub. L. 111–350, § 6(c),
Jan. 4, 2011
, 124 Stat. 3854, which Act enacted Title 41, Public Contracts.
Section is from the Legislative Branch Appropriations Act, 2008, which is div. H of the Consolidated Appropriations Act, 2008.

Keyboard: /j previous · /k next · u up a level

Source XML JSON Version history

Cite this exact text: /us/usc/?id=idddc2267f-0974-11f0-acfd-82f4bd9597b0

Citation URL: /us/usc/t2/s1816a?release=119-4