Inclusion of project or facility in Corps of Engineers workplan
In general
The Secretary shall, to the maximum extent practicable, include in the future workplan of the Corps any authorized project or facility of the Corps of Engineers—
that the Secretary has studied for disposition under an existing authority, including by carrying out a disposition study under section 549a of this title; and
for which a final report by the Director of Civil Works has been completed.